Southern Connecticut Gas will be performing trench/road work throughout Hamden at the following locations on the following tentative dates:
Conventional Mill and Pave
Pease Road(6/10-6/25) Jones Road (6/9-6/15)
Thayer Road (6/10-6/25) 4th Street (6/10-6/18)
Rockview Road (6/10-6/25) 2nd Street (6/10-6/18)
Rockwood Road (6/10-6/25)
Sunset Road (6/10-6/25)
Beaver Road (6/10-6/25)
3rd Street (6/10-6/25)